DEMOLITION SERVICES
Our lineup of equipment allows us to offer you demolition services that include small scale demolition, and medium scale concrete and rock breaking. We also provide concrete and asphalt removal, helping you dispose of unwanted material.
Concrete Removal
As part of our concrete removal, and concrete demolition services we take great care to protect the surrounding areas from flying debris and to remove and recycle the materials at an approved facility. The area is then prepared for the next stage of your vision, whether that be for a new surface or a landscaped area.
Concrete/Rock Demolition
We use a hydraulic hammer to break down and reduce the materials so they are prepared for recycling.
Once the materials have been broken down and reduced in size, we will then dispose of them at an approved recycling facility so you do not have to deal with the excess material.
Removal of Material
Asphalt Removal
As part of our Asphalt removal and asphalt disposal services, we take great care to protect the surrounding areas from damage and to remove and recycle the materials at an approved facility. As is the same with concrete removal, the area is then prepared for the next stage of your vision, whether that be for a new surface or a landscaped area.
STEP 1: Meet on Site
Meet on-site with you and/or your contractor to discuss your goals and requirements, including any future build plans or new surfaces to be installed.
STEP 2: Break Asphalt
We use a ripping claw to break up the asphalt.
STEP 3: Excavate Asphalt
We then excavate to remove the asphalt and sort the materials so they are prepared to be disposed of at an approved recycling facility.
Step 4: Prep Area for Finishing
The area is then prepared for the new surface or returned to its landscaped state.
BOOK YOUR FREE CONSULTATION
BOOK YOUR FREE
CONSULTATION TODAY
You can rest easy knowing we will get it right the first time.
Foundation Removal
As part of our foundation removal, and foundation demolition services we prepare your site to ensure all safety requirements are met, and there is no risk of flying debris causing damages to other structures. See our step-by-step process below.
STEP 1: Meet on Site
Meet on-site with you and/or your contractor to discuss your goals and requirements, including any future build plans or new surfaces to be installed to determine if soil remediation is required.
STEP 2: Material Breakup
We use a hydraulic hammer to break down and reduce the material for recycling.
STEP 3: Excavate Foundation Materials
We use an excavator to separate the materials. We then dispose of them at an approved recycling facility.
STEP 4: Prep Area for Finishing
We prepare the site for its future use so you can begin the next stage of your project.